Preview

Td Power Systems Pvt Ltd.

Satisfactory Essays
Open Document
Open Document
369 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Td Power Systems Pvt Ltd.
TD Power Systems Pvt Ltd., (TDPS) is India?s leading manufacturer of AC Generators and provider of Thermal Power Plant solutions on turnkey basis ? from Engineering to Commissioning ? up to 40 MW. TDPS Is a Joint Venture with Toyo Denki Seizo K K, Japan - a pioneer in power generators.
TDPS Generators and power plants are reputed for their impeccable performance and are approved by major consultants such as Tata Consulting Engineers, Fichtner, Holtec, Desein, M N Dastur, PDIL, Avant Garde, Mitcon, UDHE, DCPL and SPBPC.
TDPS is ISO 9001:2000 certified.
TDPS generators are custom-designed for Steam Turbine, Diesel Engine and Hydro Turbine applications. TDPS power plants are with generators manufactured in-house and prime movers of Japanese origin (steam turbine from M/S.Shin Nippon Machinery, Diesel Engines from M/S.Daihatsu or M/S.Niigata, Japan).
TDPS is committed to providing customers with Products of high quality, Reliability, timely delivery, quick and efficient after-sales-service - all at a price level that maximizes value for investment.
TDPS was established in 1999 as a Power Project Solution provider company (Power blocks) up to 40 MW - from Engineering to Commissioning.
Toyo Denki, the parent company of TDPS, was established in 1918 and was one of the first domestic manufacturers of electrical equipments for railways in Japan. It subsequently diversified into other industrial fields, including power generation equipment. In 1982, Toyo Denki began to market large generating sets in India. In 1999, Toyo Denki partnered with TDPS in a move to increase their presence in India. TDPS was thus incorporated as a privately held company and commenced operations in 1999 with Head Quarters at Bangalore.
In August 2001, it forayed into manufacturing of generators under license from Toyo Denki, Japan. A new manufacturing unit was set up for this purpose at Dabaspet, 50 km from Bangalore, India.
More
Year of Establishment | 1999 | Nature of Business |

You May Also Find These Documents Helpful

  • Better Essays

    Accopunting Analysis

    • 1515 Words
    • 7 Pages

    Michael Burton has recently been hired as the CEO of Tesca Works, Inc. Previously he had been the marketing manager for a large manufacturing company and had established a reputation for identifying new consumer trends. Tesca Works Inc. is a California-based generator manufacturing company. The company is well known for manufacturing large, heavy-duty generators at a reasonable cost. One of its greatest achievements is that its generators can be easily modified or customized for different applications. Also, Tesca Works currently builds commercial appliances.…

    • 1515 Words
    • 7 Pages
    Better Essays
  • Best Essays

    To assess the impact these new standards will have on DTE and what measures can be taken to accommodate the changes, extensive research was conducted on the relevant issues, largely through the Department of Energy and the EPA. Interviews were also conducted with a professor from Wayne State University and an engineer currently working at DTE. The major results from this research shows that, for the short term at DTE:…

    • 3385 Words
    • 14 Pages
    Best Essays
  • Powerful Essays

    International Accounting

    • 5418 Words
    • 22 Pages

    Tasman Sea and Oil Gas Company Limited (TSOGCL) the one of Australia’s largest oil and gas producer. The company is looking to enter a new opportunity of global expansion activities via existing foreign companies.…

    • 5418 Words
    • 22 Pages
    Powerful Essays
  • Better Essays

    A potential investment consideration for Generation is ABB India; a market leader in power and automation, offering solutions for efficiency in power generation, electrical transmission and increased productivity. These values tie in consistently with Generation’s mission and vision. Furthermore, the company have a strong financial position with a healthy angle to capitalise on future growth trends, have a disciplined management and a strong track record.…

    • 1017 Words
    • 5 Pages
    Better Essays
  • Good Essays

    Tata Consultancy Services

    • 7551 Words
    • 31 Pages

    Tata Consultancy Services Limited (TCS) is an Indian Multinational Information Technology (IT) services, business solutions and outsourcing services company headquartered in Mumbai, Maharashtra. TCS is a subsidiary of the Tata Group and is listed on the Bombay Stock Exchange and the National Stock Exchange of India. It is one of India 's most valuable companies and is one of the five largest India-based IT services firms.…

    • 7551 Words
    • 31 Pages
    Good Essays
  • Powerful Essays

    Japan and Mr. Prescott

    • 3735 Words
    • 15 Pages

    From its many years of international experi­ence, the company had learned that it could not hope to establish itself firmly in a foreign coun­try until it began manufacturing locally. Consequently, in 1953 the company began its preliminary negotiations with the Yamazaki Company Ltd., which culminated in the establishment of a jointly owned and operated manufacturing subsidiary. The company, known as the…

    • 3735 Words
    • 15 Pages
    Powerful Essays
  • Good Essays

    Jollibee Commissary

    • 897 Words
    • 4 Pages

    Where: Jollibee Commissary, Canlubang Laguna, The Philippines What: Two 1750DQKB generator sets, powered by QSK60 engines, one 2 MW DQKC generator set, powered by a QSK60 engine and PowerCommand® Digital Master Control MC200 from Cummins Power Generation Purpose: To provide backup for the grid power supply to the food-processing plant in the event of power outages, especially during the rainy season and also during maintenance operations Primary choice factors: Product quality and reliability, air quality in compliance with emission standards, with good after-sale service…

    • 897 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Substation

    • 1968 Words
    • 13 Pages

    Functional requirement of the project has already been considered in the documents submitted to TATA Power during the course of the project. The Documentation mentioned under the following categories may be referred during the testing.…

    • 1968 Words
    • 13 Pages
    Powerful Essays
  • Good Essays

    ipp vs tnb

    • 974 Words
    • 3 Pages

    At that time, with lack of technology as power producer by TNB evidence in Berita Semasa article (2011), Tun Dr Mahathir Mohamad blamed TNB's monopoly in electricity generation in the country on problems that was occurred in 1992 which make IPPs has been given the role in the country's energy industry.…

    • 974 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Hr Poliies

    • 3515 Words
    • 15 Pages

    | NATIONAL THERMAL POWER CORPORATION NTPC'People before PLF (Plant Load Factor)' is the guiding philosophy behind the entire gamut of HR policies at NATIONAL THERMAL POWER CORPORATION. We are strongly committed to the development and growth of all our employees as individuals and not just as employees. We currently employ approximately 26,000 people at NTPC.Competence building, Commitment building, Culture building and Systems building are the four building blocks on which our HR systems are based.…

    • 3515 Words
    • 15 Pages
    Powerful Essays
  • Powerful Essays

    Muet Speaking

    • 9978 Words
    • 40 Pages

    Powertek Berhad Project Kasturi – Combined Cycle Power Plant Functional Requirements for the Works Part B: Technical Specification Section 6 Development Requirements – Civil Works…

    • 9978 Words
    • 40 Pages
    Powerful Essays
  • Powerful Essays

    Term Paper

    • 3273 Words
    • 14 Pages

    The electricity supply industry in South Asia started with the commissioning of the first power station in the 1890s. Although a number on small stations were constructed over the next 20…

    • 3273 Words
    • 14 Pages
    Powerful Essays
  • Good Essays

    NTPC was set up in the central sector in the 1975 in response to widening demand & supply gap with the main objective of planning, promoting & organizing an integrated development to thermal power in India. Ever since its inception, NTPC has never looked back and the corporation is treading steps of success one after the other. The only PSU to have achieved excellent rating in respect of MOU targets signed with Govt. of India each year. NTPC is poised to become a 40,000 MW gint corporation by the end of XI plan i.e. 2012 AD. Lighting up one fourth of the nation, NTPC has an installed capacity of 19,291 MW from its commitment to provide quality power; all the operating stations of NTPC located in the National Capital Region & western have acquired ISO 9002 certification. The service groups like Engineering, Contracts, materials and operation Services have also bagged the ISO 9001 certification. NTPC Dadri, Ramagundam, Vindhyachal and Korba station have also bagged ISO 14001 certification.Today NTPC contributes more than 3 / 5th of the total power generation in India.…

    • 9548 Words
    • 39 Pages
    Good Essays
  • Satisfactory Essays

    Just Knowledge

    • 632 Words
    • 3 Pages

    3. Worked as a Shift Engineer(Operation)in Kranti Service & Engineering Works from 02ndMay,2010 to 08th April,2011 in Akrimota Thermal Power Station(ATPS)Under Gujarat Mineral Development Corporation(GMDC)Ltd(Govt of Gujarat Enterprise).…

    • 632 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    reliance power

    • 2651 Words
    • 11 Pages

    We intend to continue our focus on reducing the cost of power generation by acquiring and…

    • 2651 Words
    • 11 Pages
    Powerful Essays