Preview

Assembly Line Balancing

Powerful Essays
Open Document
Open Document
1083 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Assembly Line Balancing
Lecture-5

Assembly Line Balancing
Dr. Dileep S. More Operations Management Group IIM Calcutta

Objectives
• Understand the concept of assembly line balancing • Study a general procedure to balance the line • Study advantages of line balancing

Introduction
• The first movable assembly line was created by Ford to manufacture the Ford Model T • Ford installed a capstan and a thick cable to move the cars between assembly stations

Ford’s assembly line concept

A Line with Multi Operators

A
2 minutes per unit

B
3 minutes per unit

C
5 minutes per unit

D
1 minutes per unit

E
4 minutes per unit

Process Cycle Time = Throughput Rate = Process Capacity = Overall Process Utilization =

A Line with Single Operator

A
2 minutes per unit

B
3 minutes per unit

C
5 minutes per unit

D
1 minutes per unit

E
4 minutes per unit

Process Cycle Time = Throughput Rate = Process Capacity = Overall Process Utilization =

Line Balancing
Workstation-1 Workstation-2 Workstation-3

A
2 minutes per unit

B
3 minutes per unit

C
5 minutes per unit

D
1 minutes per unit

E
4 minutes per unit

Process Cycle Time = Throughput Rate = Process Capacity = Overall Process Utilization =

The objective of Line Balancing problem is to decide on the allocation of the activities to various Work stations, so as to achieve a desired out put rate, to maximize the line efficiency without violating the precedence constraints.

Line Balancing- Nomenclature
• Task: A necessary step to be performed • Workstations: The specific manufacturing or assembly stations defined to perform specific tasks. • Precedence Diagram: The relationships among tasks imposed by the product design and production method
2 A 1 B 1 G 1.4 H C 3.25 D 1.2 E .5 F 1

Line Balancing- Nomenclature
• Actual Cycle time of line (Ca)
2 A 1 B 1 G 1.4 H C 3.25 D 1.2 E .5 F 1

Maximum number of workstations = Cycle time = Minimum number of workstations =

You May Also Find These Documents Helpful

  • Better Essays

    JGT Task 1

    • 1830 Words
    • 6 Pages

    The recommendation is that management reorganizes the production process down to five stations, with appropriate tasks in each station to produce the required work boots.…

    • 1830 Words
    • 6 Pages
    Better Essays
  • Good Essays

    Having Bob pick up the sandwich bag and put it on the order rack instead of Adam, will make the process capacity slightly go up, so it would increase the revenue a little bit.…

    • 871 Words
    • 4 Pages
    Good Essays
  • Good Essays

    WGU JGT Task #1

    • 1134 Words
    • 5 Pages

    Line balancing is the methodology of equalizing the amount of work at each workstation. The principles of line balancing are needed to improve the efficiency of the production of the boots at each station. Jobs are broken down into the smallest work elements so that they can be performed by more than one worker at a single workstation. Since there is an order in which the boot construction is performed, there are precedence requirements that place restrictions on the sequence of production. (http://wps.prenhall.com/wps/media/objects)…

    • 1134 Words
    • 5 Pages
    Good Essays
  • Satisfactory Essays

    Nt1330 Unit 3

    • 472 Words
    • 2 Pages

    Fill in the blanks in the following table. Then use the table to answer the questions:…

    • 472 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Nt1330 Unit 7

    • 465 Words
    • 2 Pages

    1. e 2. i 3. d 4. h 5. b 6. c 7. j 8. g 9. a 10. f…

    • 465 Words
    • 2 Pages
    Good Essays
  • Better Essays

    Hodel Vs Irving Summary

    • 4767 Words
    • 20 Pages

    English & SD System - D gets ½, F gets ¼, H & G get 1/8.…

    • 4767 Words
    • 20 Pages
    Better Essays
  • Powerful Essays

    Shuzworld Analysis

    • 5851 Words
    • 19 Pages

    In order to improve the workflow of the assembly line, the Shanghai production facility needs to utilize the assembly line balancing tool. The assembly line balancing tool was selected because of the production facility’s goal of organizing its “assembly line to be the most efficient” by using the “correct number of workstations” (MindEdge, 2014). This tool will empower the facility to achieve its goal by…

    • 5851 Words
    • 19 Pages
    Powerful Essays
  • Satisfactory Essays

    1 2 3 4 5 6 7 8 9 0 3) Fill in the details requested by the generalized answer sheet.…

    • 6053 Words
    • 25 Pages
    Satisfactory Essays
  • Satisfactory Essays

    heyy

    • 1170 Words
    • 5 Pages

    Solutions: 1a 2c 3c 4d 5d 6c 7c 8d 9d 10a 11d 12a 13c 14c 15d 16c 17c 18b 19b 20c 21d 22a…

    • 1170 Words
    • 5 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Henry Ford Research Paper

    • 458 Words
    • 2 Pages

    Even though many people think that Henry Ford invented the assembly line, the truth is that he did not invent the assembly line. He learned about the assembly line, and used it to make cars, trucks, planes, tanks and more. The first thing that he used the assembly line for was the Ford Model T. the ford Model T was the first car to be used on the assembly line, and it was gasoline powered. It was meant for rough terrain like snow, gravel, and water. Before the assembly line was used to make cars it would take twelve hours to make a single car. But when they used the assembly line it only took two hours and thirty minutes to make a single car. The model T was so special to Henry ford because it was a good way to be transported from one place to another, and it was not only affordable it didn't cost that…

    • 458 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    CMIS 102 Homework 3

    • 342 Words
    • 3 Pages

    A = 4, B = 3, C = 2, D = 1, F = 0.…

    • 342 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Genetics Exam Study Guide

    • 2765 Words
    • 14 Pages

    will be a. HH & hh b. Hh & hH c. hH & Hh d. H & h e. h & H…

    • 2765 Words
    • 14 Pages
    Good Essays
  • Good Essays

    Automatic car wash – assembly line flow. There is a linear sequence of operations common to all cars.…

    • 1157 Words
    • 6 Pages
    Good Essays
  • Satisfactory Essays

    Eastern Gear

    • 404 Words
    • 2 Pages

    The company has a total workforce of 50 employees, who are highly skilled or semiskilled; this proves that the company can make a high quality product and at a rapid flow if the system and job shop layout is placed the right way. This will get rid of the problem of being behind of schedule and therefore the rush orders. It also has been confirmed that 75 percent of the cases, the returned orders have failed to undergo one or more operations or the operations have been improperly done. If Sam Bartholomew (engineer) and Joe Irvine (foreman) re-balance the line and locate the drilling area besides milling machines and follow the same process with the remaining operations this will create a faster and more efficient work area, and also it would be easier to supervise the product while it runs smoothly through the line instead of jumping from one operation to the other.…

    • 404 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Sunwind Ab (a) Case Solution

    • 2688 Words
    • 11 Pages

    With adjustments in the number of operators and shifts worked, a more balanced line can be achieved.…

    • 2688 Words
    • 11 Pages
    Powerful Essays